Returning from Riviera Maya....

My wife and I returned from a week at the Grand Mayan, RMaya on Feb 21. While there, we checked out the progress of the Grand Luxxe construction and talked with our sales person, Arsen. I took several photos of the three story building number one from several angles: including a few feet from the building, from the beach looking back at it, from the snack bar deck at the Brio and from the tennis courts. The building is in a triangle shape with three wings. All sides of building are shown in the photos. It looks like each top floor is made of two Villa units. Another building is going to be located between building one and the tennis courts and the foundation work is just starting. For what it is worth, the security guard who ran us out indicated that building 3 would be between the beach and building one. The sales people are saying building one will be complete by November 2010. They have a lot of work to do by then. We watched the Grand Mayan pools being built over several trips and several years. November is only 9 months from now. During this February week of President's Day, the Grand Mayan, the Iberostar and Valentine resorts next door were nearly 100% occupied. Hope these pictures are informative. I may have to send the photos separately and you can attach. each photo is named with the view point.

Best Regards,

Bob and Christina


Permalink: https://aimfair.com./blogpost21-Returning-from-Riviera-Maya