New Entrance Train-Reception Station Nov 19 2011 (01)

November 19, 2011 - Original Guest Entrance - The train station - at the area now called Vidanta World....

Vidanta World - Construction Update

December 13, 2020

This is one of the original plans for the area now called Vidanta World:

Vidanta Celebrate Park Plan 7 10 12

This plan was circulating in 2012. It shows the entrance where the structure in the leadin photo is located.


Today, the buildings are in place and getting ready for use. It doesn't look as though construction will be done anytime soon. Maybe 2024 for Phase One? The source of many of these photos is Themeparx.com and Facebook. Themeparx specializes in staying up with theme park development throughout the world. The site has done an outstanding job of collecting and presenting information about new theme park concepts.

20-11-12 NV Cirque Theme 08 Structure 1200x750

This could be a Cirque du Soleil structure that may be under construction now.


20-11-16 NV Cirque Structure 1200x850

This photo is interesting because it shows Gondola Station #4 in the upper left portion of the photo and the start of the restaurant section, which is the white cement structure behind the circular structure in the foreground. Will the circular structure become the Cirque du Soleil theater? It certainly has all the small spaces to make it so. Stay tuned....


AR Topo Vidanta World Hotels 20 11 16

This view shows the smaller Cascades bulding next to another larger building. Names were assigned to these buildings in prior versions of the development. The larger building could be a Kingdom of the Sun family member. Note the extension of the changing topography on the right side of the photo. This photo was taken around November 16, 2020.


AR Topo Changing Infrastructure 20 11 16

Infrastructure is changing. New configuration coming? This photo was taken around November 16, 2020.


20-11-16 NV The Parks construction 02 1200x850

Changes to the Infrastructure tunnel that connects all the above ground commercial structures - September 13, 2020.


20-11-16 NV The Parks construction 01 1200x850

This area may become the walking entrance to the park from the parking lot. A large water feature may greet guests entering from the parking lot. Note Gondola Station #2 that will take guests from the entrance to the park to the Grand Bliss Gondola station at the beach. Date: September 13, 2020.


20-10-10 Parking Lot Station 1200x700

This area is near the second Gondola station - next to the parking lot and entrance to the Park. Date: September 13, 2020.


9-21-20 The Parks Kingdom of the Sun 1200x850

The hotels are skeletons now. The one on the left may be the Presidential Tower, and the one on the right may be one of the Kingdom of the Sun towers. Date: September 13, 2020.


9-21-20 The Parks Kingdom of the Sun Theme Parks 02 1200x850

This tower seems to have corner units with decks. It is the last building on the north side of the property. Kingdom of the Sun Building II? Photo as of September 13, 2020.


10-15-20 Kingdom of the Sun Theme Parks 1200x850

This tower is the same one that has the corner units with decks. Note the facia being installed. Photo as of September 13, 2020.


9-11-20 The Parks Kingdom of the Sun Theme Parks 1200x850

This view shows the next set of buildings. Photo as of September 13, 2020.


20-11-16 NV The Parks construction 03 1200x850

Here is a view from the top of the building with corner units with decks. Photo as of September 13, 2020.


9-14-20 The Parks Kingdom of the Sun Theme Parks 1200x850

Back on the ground, the corner decks are pronouced in this photo. Photo as of September 13, 2020.


9-21-20 The Parks Kingdom of the Sun Theme Parks 03 1200x849

This photo seems to show the height of the lobby area. The man working on the scaffolding seems to be in a central area. But then again, that is just a guess. Photo as of September 13, 2020.


9-21-20 The Parks Kingdom of the Sun Theme Parks 04 1250x850

The view from a future room. Photo as of September 13, 2020.


20-11-16 A Cirque Hotel 800x1000

The interiors of the buildings is empty. Nothing being installed yet, and probably nothing will be installed for another year or two. Photo as of September 13, 2020.


20-11-16 NV The Parks construction 06 1200x750

The backside of the buildings are solid, so there are no windows looking toward Jarretaderas. Photo as of September 13, 2020.


20-11-16 NV The Parks construction 05 1200x850

The backside of the buildings are solid, so there are no windows looking toward Jarretaderas. Photo as of September 13, 2020.

There is a lot to do before Vidanta World opens. Certainly, we will not recognize it when it does finally open because the changes will make this an entirely different space. Stay tuned....
Return to Current News ...OR... Return to Photos and Videos ...OR… Summary Page